Reliable in-building cellular coverage and code-required public safety radio signal, designed and installed to NFPA and local fire code standards.
Most buildings need coverage for two different reasons, and both start with a signal survey.
Boosts two-way radio signal for fire and police inside large or dense buildings, required by NFPA 72, NFPA 1221, and the International Fire Code (IFC) in most jurisdictions.
Boosts carrier cell signal (Verizon, AT&T, T-Mobile) so employees, tenants, and visitors get reliable calls and data throughout the building.
We start with an RF signal survey to identify dead zones, then design a system sized to the building, coordinate permitting with the local fire authority, and complete acceptance testing to confirm code-required signal strength in every area, including stairwells and elevators.
Many new builds and renovations can't get a certificate of occupancy without passing public safety radio coverage testing.
Concrete, low-E glass, and metal framing block outdoor signal, especially in below-grade and interior spaces.
Dropped calls and no data hurt productivity and tenant satisfaction in offices, hotels, and multifamily buildings.
"The team at Connected Communications was kind, professional, and helped create a solution that was perfect for my needs and budget."
"Connected has done 2 jobs and will do our third next month. Expert guys with strong on-time work ethic!"
"Charles and James were on time, courteous professionals who did an excellent job for us."
In most Sacramento-area jurisdictions, yes. NFPA 72, NFPA 1221, and the International Fire Code require in-building radio coverage for new construction and major renovations above a certain size.
Public safety DAS carries fire and police two-way radio traffic and is code-required. Cellular DAS boosts carrier signal for phones and is about tenant experience, not code.
Yes, we coordinate with the local fire authority on permitting and complete acceptance testing to confirm signal strength meets code in every area of the building.
Timelines depend on building size and complexity. A signal survey and design come first, then installation and testing are scheduled around your construction timeline.
Call or text us at 916-250-1141 or email design@connected-com.com
Request Quote